
- This event has passed.
GAS TURBINE GENERATOR (GTG) – GOVERNOR / AVR / GENERATOR CAPABILITY for INDUSTRIAL FACILITIES
March 6, 2018 @ 5:00 pm - March 7, 2018 @ 8:30 pm CST
A combination of three directly related GTG control application topics – governor speed control, automatic voltage regulator voltage control with an explanation of the generator capability curve fundamentals and limitation. Industrial applications include islanding and non-islanding generating facilities. PCIC 2011 governor presentation, PCIC 2016 AVR presentation and 1953 IEEE generator capability paper are emphasized.
|
Speaker(s): Roy Cossé ,
Location:
Jacobs Engineering, Tower Two
5985 Rogerdale Road
Houston, Texas
77072